Train Chart Vacancy

12002 New Delhi - Rani Kamalapati Shatabdi Express Time Table

Departs
06:00
New Delhi NDLS
Arrives
14:40
Rani Kamalapati RKMP
Journey
8h 40m
707 km · 11 stops
Chart expected
about 20:00
the day before travel — a target, not a guarantee (what this rests on)

12002 New Delhi - Rani Kamalapati Shatabdi Express leaves New Delhi (NDLS) at 06:00 and reaches Rani Kamalapati (RKMP) at 14:40 the same day. The booked run is 707 km in 8h 40m, with 11 stops including both ends. It is the only train this timetable version books from New Delhi (NDLS) through to Rani Kamalapati (RKMP). Runs daily.

12002 at a glance

12002 in timetable version .
Runs onDaily
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed81.6 km/h including halts — ours (how)
TypeShatabdi · Premium
ReservationReserved (PRS) train. 12002 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

11 stops from New Delhi NDLS to Rani Kamalapati RKMP, timed by version , km counted from NDLS.
StationArrivesDepartsHaltKm
NDLS New Delhi start 06:00 — 0
MTJ Mathura Jn 07:19 07:20 1m 141
AGC Agra Cantt Jn 07:50 07:55 5m 194
DHO Dhaulpur 08:39 08:40 1m 246
MRA Morena 08:57 08:58 1m 274
GWL Gwalior Jn 09:23 09:28 5m 312
VGLJ Virangana Lakshmibai Jhansi Jn 10:45 10:50 5m 411
LAR Lalitpur 11:42 11:43 1m 499
BINA Bina Jn 12:40 12:42 2m 562
BPL Bhopal Jn 14:12 14:15 3m 701
RKMP Rani Kamalapati 14:40 end — 707

What 12002’s schedule looks like

Its longest run without a stop is 141 km and 1h 19m from New Delhi (NDLS) to Mathura Jn (MTJ). The next longest is 139 km and 1h 30m from Bina Jn (BINA) to Bhopal Jn (BPL).

3 of its 9 intermediate stops are booked for five minutes or more, the longest of them 5 minutes at Agra Cantt Jn (AGC), 5 minutes at Gwalior Jn (GWL), 5 minutes at Virangana Lakshmibai Jhansi Jn (VGLJ). The briefest stop is 1 minute at Mathura Jn (MTJ).

It passes its own halfway mark of 354 km at Virangana Lakshmibai Jhansi Jn (VGLJ), stop number 7 of 11, and is booked to stand at its stops for 24 minutes in all, 5% of the 8h 40m journey.

Its quickest booked leg is New Delhi (NDLS) to Mathura Jn (MTJ), 141 km at an average of 107 km/h.

After New Delhi it calls first at Mathura Jn (MTJ), Agra Cantt Jn (AGC), Dhaulpur (DHO), Morena (MRA) and Gwalior Jn (GWL).

Its last stops before Rani Kamalapati are Gwalior Jn (GWL), Virangana Lakshmibai Jhansi Jn (VGLJ), Lalitpur (LAR), Bina Jn (BINA) and Bhopal Jn (BPL).

Its stops are not evenly spread: 5 of the 9 fall in the first half of the distance and 4 in the second.

The busiest stations on its route are New Delhi (NDLS), where 335 trains call, Virangana Lakshmibai Jhansi Jn (VGLJ), where 321 trains call, Mathura Jn (MTJ), where 273 trains call.

How these are counted.

Other trains that share 12002’s route

From 12002’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

12002 is booked out of New Delhi at 06:00, which puts it under rule RB-16.12.2025-A: its first reservation chart is expected at about 20:00 on the day before the journey. How we work this out.

A target, not a guarantee

It assumes 12002 is charted at New Delhi. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 12002 — New Delhi to Rani Kamalapati, fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 20:00 above comes from a published railway order, worked out, never observed.