Train Chart Vacancy

14313 Lokmanyatilak - Bareilly(NR) Bareilly Express Time Table

Departs
08:05
Lokmanyatilak LTT
Arrives
15:20 day 2
Bareilly(NR) BE
Journey
31h 15m
1595 km · 26 stops
Chart expected
about 20:00
the day before travel — a target, not a guarantee (what this rests on)

14313 Lokmanyatilak - Bareilly(NR) Bareilly Express leaves Lokmanyatilak (LTT) at 08:05 and reaches Bareilly(NR) (BE) at 15:20 on day 2 of the run. The booked run is 1595 km in 31h 15m, with 26 stops including both ends. It is the only train this timetable version books from Lokmanyatilak (LTT) through to Bareilly(NR) (BE). Runs Mon. That is a stop every 64 km on average.

14313 at a glance

14313 in timetable version .
Runs onMon
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed51.0 km/h including halts — ours (how)
TypeExpress · Express
ReservationReserved (PRS) train. 14313 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

26 stops from Lokmanyatilak LTT to Bareilly(NR) BE, timed by version , km counted from LTT. +1 is the next day.
StationArrivesDepartsHaltKm
LTT Lokmanyatilak start 08:05 — 0
KYN Kalyan Jn 08:37 08:40 3m 37
NK Nasik Road 11:15 11:20 5m 171
MMR Manmad Jn 12:15 12:20 5m 244
JL Jalgaon Jn 14:08 14:10 2m 404
BSL Bhusaval Jn 14:45 14:50 5m 428
BAU Burhanpur 15:38 15:40 2m 482
KNW Khandwa Junction 16:47 16:50 3m 551
HD Harda 17:58 18:00 2m 658
ET Itarsi Jn 19:40 19:45 5m 734
RKMP Rani Kamalapati 21:13 21:15 2m 819
BPL Bhopal Jn 21:30 21:40 10m 825
BINA Bina Jn 00:10 +1 00:15 +1 5m 964
VGLJ Virangana Lakshmibai Jhansi Jn 03:05 +1 03:13 +1 8m 1115
GWL Gwalior Jn 04:25 +1 04:27 +1 2m 1213
MRA Morena 04:59 +1 05:01 +1 2m 1252
AGC Agra Cantt Jn 06:25 +1 06:30 +1 5m 1332
AF Agra Fort 07:00 +1 07:10 +1 10m 1335
ETUE Etmadpur Jn 07:48 +1 07:50 +1 2m 1353
ALJN Aligarh Jn 10:05 +1 10:10 +1 5m 1431
DIB Dibai 11:23 +1 11:25 +1 2m 1473
BBA Babrala 11:40 +1 11:45 +1 5m 1486
CH Chandausi Jn 13:05 +1 13:10 +1 5m 1529
DUB Dabtara 13:32 +1 13:34 +1 2m 1553
AO Aonla 13:51 +1 13:53 +1 2m 1571
BE Bareilly(NR) 15:20 +1 end — 1595

What 14313’s schedule looks like

Its longest run without a stop is 160 km and 1h 48m from Manmad Jn (MMR) to Jalgaon Jn (JL). The next longest is 151 km and 2h 50m from Bina Jn (BINA) to Virangana Lakshmibai Jhansi Jn (VGLJ).

At 22:00 it is between Bhopal Jn (BPL) and Bina Jn (BINA), and at 06:00 on day 2 of the run it is between Morena (MRA) and Agra Cantt Jn (AGC).

12 of its 24 intermediate stops are booked for five minutes or more, the longest of them 10 minutes at Bhopal Jn (BPL), 10 minutes at Agra Fort (AF), 8 minutes at Virangana Lakshmibai Jhansi Jn (VGLJ), 5 minutes at Nasik Road (NK), 5 minutes at Manmad Jn (MMR). The briefest stop is 2 minutes at Jalgaon Jn (JL).

The run crosses midnight before Bina Jn (BINA); every later time carries a day marker.

It passes its own halfway mark of 798 km at Rani Kamalapati (RKMP), stop number 11 of 26, and is booked to stand at its stops for 99 minutes in all, 5% of the 31h 15m journey.

Its quickest booked leg is Khandwa Junction (KNW) to Harda (HD), 107 km at an average of 94 km/h.

After Lokmanyatilak it calls first at Kalyan Jn (KYN), Nasik Road (NK), Manmad Jn (MMR), Jalgaon Jn (JL) and Bhusaval Jn (BSL).

Its last stops before Bareilly(NR) are Dibai (DIB), Babrala (BBA), Chandausi Jn (CH), Dabtara (DUB) and Aonla (AO).

Its stops are not evenly spread: 9 of the 24 fall in the first half of the distance and 15 in the second.

The busiest stations on its route are Kalyan Jn (KYN), where 696 trains call, Itarsi Jn (ET), where 417 trains call, Bhusaval Jn (BSL), where 397 trains call.

At KYN it is booked in at 08:37 and away again at 08:40, 37 km into the run.

How these are counted.

Other trains that share 14313’s route

From 14313’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

14313 is booked out of Lokmanyatilak at 08:05, which puts it under rule RB-16.12.2025-A: its first reservation chart is expected at about 20:00 on the day before the journey. How we work this out.

A target, not a guarantee

It assumes 14313 is charted at Lokmanyatilak. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 14313 — Lokmanyatilak to Bareilly(NR), fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 20:00 above comes from a published railway order, worked out, never observed.