Train Chart Vacancy

12313 Sealdah - New Delhi Rajdhani Express Time Table

Departs
16:50
Sealdah SDAH
Arrives
10:50 day 2
New Delhi NDLS
Journey
18h 00m
1461 km · 8 stops
Chart expected
about 06:50
on the day of travel — a target, not a guarantee (what this rests on)

12313 Sealdah - New Delhi Rajdhani Express leaves Sealdah (SDAH) at 16:50 and reaches New Delhi (NDLS) at 10:50 on day 2 of the run. The booked run is 1461 km in 18h 00m, with 8 stops including both ends. It is the only train this timetable version books from Sealdah (SDAH) through to New Delhi (NDLS). Runs daily.

12313 at a glance

12313 in timetable version .
Runs onDaily
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed81.2 km/h including halts — ours (how)
TypeRajdhani · Premium
ReservationReserved (PRS) train. 12313 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

8 stops from Sealdah SDAH to New Delhi NDLS, timed by version , km counted from SDAH. +1 is the next day.
StationArrivesDepartsHaltKm
SDAH Sealdah start 16:50 — 0
DGR Durgapur 18:38 18:40 2m 171
ASN Asansol Jn 19:06 19:10 4m 213
DHN Dhanbad Jn 20:20 20:25 5m 270
GAYA Gaya Jn 22:57 23:00 3m 469
DDU PT.Deen Dayal Upadhyaya Jn 01:13 +1 01:20 +1 7m 673
CNB Kanpur Central 05:15 +1 05:20 +1 5m 1020
NDLS New Delhi 10:50 +1 end — 1461

What 12313’s schedule looks like

Its longest run without a stop is 441 km and 5h 30m from Kanpur Central (CNB) to New Delhi (NDLS). The next longest is 347 km and 3h 55m from PT.Deen Dayal Upadhyaya Jn (DDU) to Kanpur Central (CNB).

At 22:00 it is between Dhanbad Jn (DHN) and Gaya Jn (GAYA), and at 06:00 on day 2 of the run it is between Kanpur Central (CNB) and New Delhi (NDLS).

3 of its 6 intermediate stops are booked for five minutes or more, the longest of them 7 minutes at PT.Deen Dayal Upadhyaya Jn (DDU), 5 minutes at Dhanbad Jn (DHN), 5 minutes at Kanpur Central (CNB). The briefest stop is 2 minutes at Durgapur (DGR).

The run crosses midnight before PT.Deen Dayal Upadhyaya Jn (DDU); every later time carries a day marker.

It passes its own halfway mark of 730 km at Kanpur Central (CNB), stop number 7 of 8, and is booked to stand at its stops for 26 minutes in all, 2% of the 18h 00m journey.

Its quickest booked leg is Durgapur (DGR) to Asansol Jn (ASN), 42 km at an average of 97 km/h.

After Sealdah it calls first at Durgapur (DGR), Asansol Jn (ASN), Dhanbad Jn (DHN), Gaya Jn (GAYA) and PT.Deen Dayal Upadhyaya Jn (DDU).

Its last stops before New Delhi are Asansol Jn (ASN), Dhanbad Jn (DHN), Gaya Jn (GAYA), PT.Deen Dayal Upadhyaya Jn (DDU) and Kanpur Central (CNB).

Its stops are not evenly spread: 5 of the 6 fall in the first half of the distance and 1 in the second.

The busiest stations on its route are Sealdah (SDAH), where 732 trains call, Kanpur Central (CNB), where 429 trains call, PT.Deen Dayal Upadhyaya Jn (DDU), where 400 trains call.

How these are counted.

Other trains that share 12313’s route

From 12313’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

12313 is booked out of Sealdah at 16:50, which puts it under rule RB-16.12.2025-B: its first reservation chart is expected at about 06:50 on the day of the journey. How we work this out.

A target, not a guarantee

It assumes 12313 is charted at Sealdah. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 12313 — Sealdah to New Delhi, fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 06:50 above comes from a published railway order, worked out, never observed.