Train Chart Vacancy

18119 Tatanagar Jn - Jaynagar Express Time Table

Departs
18:40
Tatanagar Jn TATA
Arrives
11:35 day 2
Jaynagar JYG
Journey
16h 55m
646 km · 18 stops
Chart expected
about 08:40
on the day of travel — a target, not a guarantee (what this rests on)

18119 Tatanagar Jn - Jaynagar Express leaves Tatanagar Jn (TATA) at 18:40 and reaches Jaynagar (JYG) at 11:35 on day 2 of the run. The booked run is 646 km in 16h 55m, with 18 stops including both ends. It is the only train this timetable version books from Tatanagar Jn (TATA) through to Jaynagar (JYG). Runs Fri. That is a stop every 38 km on average.

18119 at a glance

18119 in timetable version .
Runs onFri
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed38.2 km/h including halts — ours (how)
TypeExpress · Express
ReservationReserved (PRS) train. 18119 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

18 stops from Tatanagar Jn TATA to Jaynagar JYG, timed by version , km counted from TATA. +1 is the next day.
StationArrivesDepartsHaltKm
TATA Tatanagar Jn start 18:40 — 0
CNI Chandil Jn 19:45 19:47 2m 36
MURI Muri Jn 20:45 20:47 2m 104
KSX Kotshila 21:23 21:25 2m 128
BKSC Bokaro Steel City 21:55 22:00 5m 157
RJB Rajabera 23:14 23:16 2m 168
DHN Dhanbad Jn 00:40 +1 00:45 +1 5m 206
PKA Pradhankhunta 01:04 +1 01:06 +1 2m 216
MDP Madhupur Jn 02:29 +1 02:31 +1 2m 323
JSME Jasidih Jn 03:01 +1 03:03 +1 2m 352
JAJ Jhajha 04:20 +1 04:25 +1 5m 396
KIUL Kiul Jn 05:03 +1 05:05 +1 2m 450
BJU Barauni Jn 06:50 +1 07:00 +1 10m 489
SPJ Samastipur Jn 08:20 +1 08:25 +1 5m 540
DBG Darbhanga Jn 09:45 +1 09:50 +1 5m 578
SKI Sakri Jn 10:24 +1 10:26 +1 2m 597
MBI Madhubani 10:40 +1 10:42 +1 2m 614
JYG Jaynagar 11:35 +1 end — 646

What 18119’s schedule looks like

Its longest run without a stop is 107 km and 1h 23m from Pradhankhunta (PKA) to Madhupur Jn (MDP). The next longest is 68 km and 0h 58m from Chandil Jn (CNI) to Muri Jn (MURI).

At 22:00 it is standing at Bokaro Steel City (BKSC), and at 06:00 on day 2 of the run it is between Kiul Jn (KIUL) and Barauni Jn (BJU).

6 of its 16 intermediate stops are booked for five minutes or more, the longest of them 10 minutes at Barauni Jn (BJU), 5 minutes at Bokaro Steel City (BKSC), 5 minutes at Dhanbad Jn (DHN), 5 minutes at Jhajha (JAJ), 5 minutes at Samastipur Jn (SPJ). The briefest stop is 2 minutes at Chandil Jn (CNI).

The run crosses midnight before Dhanbad Jn (DHN); every later time carries a day marker.

It passes its own halfway mark of 323 km at Madhupur Jn (MDP), stop number 9 of 18, and is booked to stand at its stops for 55 minutes in all, 5% of the 16h 55m journey.

Its quickest booked leg is Jhajha (JAJ) to Kiul Jn (KIUL), 54 km at an average of 85 km/h.

After Tatanagar Jn it calls first at Chandil Jn (CNI), Muri Jn (MURI), Kotshila (KSX), Bokaro Steel City (BKSC) and Rajabera (RJB).

Its last stops before Jaynagar are Barauni Jn (BJU), Samastipur Jn (SPJ), Darbhanga Jn (DBG), Sakri Jn (SKI) and Madhubani (MBI).

Its stops are not evenly spread: 8 of the 16 fall in the first half of the distance and 8 in the second.

The busiest stations on its route are Jasidih Jn (JSME), where 223 trains call, Samastipur Jn (SPJ), where 212 trains call, Kiul Jn (KIUL), where 209 trains call.

At JSME it is booked in at 03:01 and away again at 03:03, 352 km into the run.

How these are counted.

Other trains that share 18119’s route

From 18119’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

18119 is booked out of Tatanagar Jn at 18:40, which puts it under rule RB-16.12.2025-B: its first reservation chart is expected at about 08:40 on the day of the journey. How we work this out.

A target, not a guarantee

It assumes 18119 is charted at Tatanagar Jn. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 18119 — Tatanagar Jn to Jaynagar, fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 08:40 above comes from a published railway order, worked out, never observed.