Train Chart Vacancy

13175 Sealdah - Silchar Kanchanjunga Time Table

Departs
06:50
Sealdah SDAH
Arrives
14:40 day 2
Silchar SCL
Journey
31h 50m
1365 km · 41 stops
Chart expected
about 20:00
the day before travel — a target, not a guarantee (what this rests on)

13175 Sealdah - Silchar Kanchanjunga leaves Sealdah (SDAH) at 06:50 and reaches Silchar (SCL) at 14:40 on day 2 of the run. The booked run is 1365 km in 31h 50m, with 41 stops including both ends. It is the only train this timetable version books from Sealdah (SDAH) through to Silchar (SCL). Runs Mon, Wed, Sat. That is a stop every 34 km on average.

13175 at a glance

13175 in timetable version .
Runs onMon, Wed, Sat
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed42.9 km/h including halts — ours (how)
TypeOther · Express
ReservationReserved (PRS) train. 13175 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

41 stops from Sealdah SDAH to Silchar SCL, timed by version , km counted from SDAH. +1 is the next day.
StationArrivesDepartsHaltKm
SDAH Sealdah start 06:50 — 0
DAKE Dakhineswar 07:06 07:08 2m 16
BWN Bardhaman 08:34 08:36 2m 107
BHP Bolpur S Niktn 09:23 09:28 5m 159
AMP Ahamadpur Jn 09:46 09:48 2m 178
SNT Sainthia 10:00 10:02 2m 191
RPH Rampur Hat 10:25 10:27 2m 219
MRR Murarai 10:52 10:54 2m 250
PKR Pakur 11:15 11:17 2m 274
NFK New Farakka Jn 12:40 12:42 2m 307
MLDT Malda Town 13:30 13:40 10m 341
SM Samsi 14:13 14:15 2m 376
HCR Harischandrpur 14:32 14:34 2m 397
AZR Azamnagar Road 14:48 14:50 2m 417
BOE Barsoi Jn 15:08 15:10 2m 429
DLK Dalkolha 15:30 15:32 2m 459
KNE Kishanganj 16:08 16:10 2m 487
AUB Aluabari Road 16:33 16:35 2m 517
NJP New Jalpaiguri 17:55 18:05 10m 574
JPE Jalpaiguri Road 18:38 18:40 2m 608
DQG Dhupguri 19:13 19:15 2m 639
FLK Falakata 19:35 19:37 2m 662
NCB New Cooch Behar 20:10 20:15 5m 700
NOQ New Alipurduar 20:35 20:40 5m 719
KAMG Kamakhyaguri 20:58 21:00 2m 739
GOGH Gossaigaon Hat 21:20 21:22 2m 764
FKM Fakiragram Jn 21:40 21:42 2m 787
KOJ Kokrajhar 21:53 21:55 2m 797
BSGN Basugaon 22:10 22:12 2m 813
NBQ New Bongaigaon 22:50 23:00 10m 828
BPRD Barpeta Road 23:30 23:35 5m 873
RNY Rangiya Jn 00:25 +1 00:30 +1 5m 938
KYQ Kamakhya 02:20 +1 02:25 +1 5m 979
GHY Guwahati 02:40 +1 02:50 +1 10m 985
LKA Lanka 04:55 +1 04:57 +1 2m 1135
LMG Lumding Jn 06:20 +1 06:35 +1 15m 1166
MXR Mahur 09:02 +1 09:04 +1 2m 1255
NHLG New Haflong 09:20 +1 09:25 +1 5m 1265
BHZ Bihara 11:25 +1 11:27 +1 2m 1320
BPB Badarpur Jn 12:30 +1 12:40 +1 10m 1336
SCL Silchar 14:40 +1 end — 1365

What 13175’s schedule looks like

Its longest run without a stop is 150 km and 2h 05m from Guwahati (GHY) to Lanka (LKA). The next longest is 91 km and 1h 26m from Dakhineswar (DAKE) to Bardhaman (BWN).

At 22:00 it is between Kokrajhar (KOJ) and Basugaon (BSGN), and at 06:00 on day 2 of the run it is between Lanka (LKA) and Lumding Jn (LMG).

13 of its 39 intermediate stops are booked for five minutes or more, the longest of them 15 minutes at Lumding Jn (LMG), 10 minutes at Malda Town (MLDT), 10 minutes at New Jalpaiguri (NJP), 10 minutes at New Bongaigaon (NBQ), 10 minutes at Guwahati (GHY). The briefest stop is 2 minutes at Dakhineswar (DAKE).

The run crosses midnight before Rangiya Jn (RNY); every later time carries a day marker.

It passes its own halfway mark of 682 km at New Cooch Behar (NCB), stop number 23 of 41, and is booked to stand at its stops for 152 minutes in all, 8% of the 31h 50m journey.

Its quickest booked leg is Barsoi Jn (BOE) to Dalkolha (DLK), 30 km at an average of 90 km/h.

After Sealdah it calls first at Dakhineswar (DAKE), Bardhaman (BWN), Bolpur S Niktn (BHP), Ahamadpur Jn (AMP) and Sainthia (SNT).

Its last stops before Silchar are Lumding Jn (LMG), Mahur (MXR), New Haflong (NHLG), Bihara (BHZ) and Badarpur Jn (BPB).

Its stops are not evenly spread: 21 of the 39 fall in the first half of the distance and 18 in the second.

The busiest stations on its route are Sealdah (SDAH), where 732 trains call, Bardhaman (BWN), where 349 trains call, New Jalpaiguri (NJP), where 204 trains call.

How these are counted.

Other trains that share 13175’s route

From 13175’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

13175 is booked out of Sealdah at 06:50, which puts it under rule RB-16.12.2025-A: its first reservation chart is expected at about 20:00 on the day before the journey. How we work this out.

A target, not a guarantee

It assumes 13175 is charted at Sealdah. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 13175 — Sealdah to Silchar, fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 20:00 above comes from a published railway order, worked out, never observed.