Train Chart Vacancy

15929 Tambaram - New Tinsukia Express Time Table

Departs
18:40
Tambaram TBM
Arrives
07:10 day 4
New Tinsukia NTSK
Journey
60h 30m
3227 km · 47 stops
Chart expected
about 08:40
on the day of travel — a target, not a guarantee (what this rests on)

15929 Tambaram - New Tinsukia Express leaves Tambaram (TBM) at 18:40 and reaches New Tinsukia (NTSK) at 07:10 on day 4 of the run. The booked run is 3227 km in 60h 30m, with 47 stops including both ends. It is the only train this timetable version books from Tambaram (TBM) through to New Tinsukia (NTSK). Runs Thu. That is a stop every 70 km on average.

15929 at a glance

15929 in timetable version .
Runs onThu
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed53.3 km/h including halts — ours (how)
TypeExpress · Express
ReservationReserved (PRS) train. 15929 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

47 stops from Tambaram TBM to New Tinsukia NTSK, timed by version , km counted from TBM. +1 is the next day, +2 the one after.
StationArrivesDepartsHaltKm
TBM Tambaram start 18:40 — 0
MS Chennai Egmore 19:05 19:15 10m 25
NLR Nellore 22:23 22:25 2m 204
OGL Ongole 23:53 23:55 2m 320
BZA Vijayawada Jn 02:05 +1 02:15 +1 10m 459
EE Eluru 02:58 +1 03:00 +1 2m 518
RJY Rajamundry 04:53 +1 04:55 +1 2m 608
VSKP Visakhapatnam 08:50 +1 09:10 +1 20m 809
BAM Brahmapur 13:10 +1 13:15 +1 5m 1086
KUR Khurda Road Jn 15:05 +1 15:25 +1 20m 1233
BBS Bhubaneswar 15:45 +1 15:50 +1 5m 1251
CTC Cuttack 16:25 +1 16:30 +1 5m 1279
BHC Bhadrakh 19:00 +1 19:02 +1 2m 1394
BLS Balasore 19:28 +1 19:30 +1 2m 1453
HIJ Hijli 20:50 +1 21:00 +1 10m 1565
TATA Tatanagar Jn 23:22 +1 23:27 +1 5m 1698
PRR Purulia Jn 01:08 +2 01:10 +2 2m 1788
JOC Joychandi Pahar 01:58 +2 02:00 +2 2m 1827
BURN Burnpur 02:27 +2 02:28 +2 1m 1859
ASN Asansol Jn 03:05 +2 03:15 +2 10m 1864
UDL Andal Jn 03:36 +2 03:37 +2 1m 1890
DGR Durgapur 03:55 +2 04:15 +2 20m 1906
SURI Siuri 05:19 +2 05:21 +2 2m 1983
RPH Rampur Hat 06:33 +2 06:35 +2 2m 2030
PKR Pakur 07:17 +2 07:19 +2 2m 2084
NFK New Farakka Jn 08:06 +2 08:08 +2 2m 2118
MLDT Malda Town 09:00 +2 09:10 +2 10m 2152
BOE Barsoi Jn 10:28 +2 10:30 +2 2m 2240
KNE Kishanganj 11:25 +2 11:27 +2 2m 2297
NJP New Jalpaiguri 13:00 +2 13:10 +2 10m 2385
DQG Dhupguri 14:30 +2 14:35 +2 5m 2450
NCB New Cooch Behar 15:25 +2 15:30 +2 5m 2511
NOQ New Alipurduar 15:45 +2 15:50 +2 5m 2529
KOJ Kokrajhar 16:48 +2 16:50 +2 2m 2608
NBQ New Bongaigaon 17:35 +2 17:45 +2 10m 2639
SBE Sorbhog Jn 18:20 +2 18:22 +2 2m 2675
TIHU Tihu 18:53 +2 18:55 +2 2m 2714
RNY Rangiya Jn 20:00 +2 20:05 +2 5m 2748
ULG Udalguri 20:43 +2 20:45 +2 2m 2809
NMM New Misamari 21:28 +2 21:30 +2 2m 2861
RPAN Rangapara North 22:20 +2 22:30 +2 10m 2871
VNE Vishwanath Chariali 23:15 +2 23:17 +2 2m 2922
HMY Harmuti 01:20 +3 01:25 +3 5m 3024
NLP North Lakhimpur 02:30 +3 02:35 +3 5m 3054
DMC Dhemaji 03:57 +3 03:59 +3 2m 3124
DBRG Dibrugarh 05:00 +3 05:10 +3 10m 3186
NTSK New Tinsukia 07:10 +3 end — 3227

What 15929’s schedule looks like

Its longest run without a stop is 277 km and 4h 00m from Visakhapatnam (VSKP) to Brahmapur (BAM). The next longest is 201 km and 3h 55m from Rajamundry (RJY) to Visakhapatnam (VSKP).

At 22:00 it is between Chennai Egmore (MS) and Nellore (NLR), and at 06:00 on day 2 of the run it is between Rajamundry (RJY) and Visakhapatnam (VSKP).

22 of its 45 intermediate stops are booked for five minutes or more, the longest of them 20 minutes at Visakhapatnam (VSKP), 20 minutes at Khurda Road Jn (KUR), 20 minutes at Durgapur (DGR), 10 minutes at Chennai Egmore (MS), 10 minutes at Vijayawada Jn (BZA). The briefest stop is 1 minute at Burnpur (BURN).

The run crosses midnight before Vijayawada Jn (BZA); every later time carries a day marker.

It passes its own halfway mark of 1614 km at Tatanagar Jn (TATA), stop number 16 of 47, and is booked to stand at its stops for 244 minutes in all, 7% of the 60h 30m journey.

Its quickest booked leg is Bhadrakh (BHC) to Balasore (BLS), 59 km at an average of 136 km/h.

After Tambaram it calls first at Chennai Egmore (MS), Nellore (NLR), Ongole (OGL), Vijayawada Jn (BZA) and Eluru (EE).

Its last stops before New Tinsukia are Vishwanath Chariali (VNE), Harmuti (HMY), North Lakhimpur (NLP), Dhemaji (DMC) and Dibrugarh (DBRG).

Its stops are not evenly spread: 14 of the 45 fall in the first half of the distance and 31 in the second.

The busiest stations on its route are Tambaram (TBM), where 526 trains call, Chennai Egmore (MS), where 495 trains call, Vijayawada Jn (BZA), where 480 trains call.

How these are counted.

Other trains that share 15929’s route

From 15929’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

15929 is booked out of Tambaram at 18:40, which puts it under rule RB-16.12.2025-B: its first reservation chart is expected at about 08:40 on the day of the journey. How we work this out.

A target, not a guarantee

It assumes 15929 is charted at Tambaram. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 15929 — Tambaram to New Tinsukia, fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 08:40 above comes from a published railway order, worked out, never observed.