Train Chart Vacancy

12511 Gorakhpur Jn - Thiruvananthapuram North Raptisagar Express Time Table

Departs
06:33
Gorakhpur Jn GKP
Arrives
15:40 day 3
Thiruvananthapuram North TVCN
Journey
57h 07m
3236 km · 60 stops
Chart expected
about 20:00
the day before travel — a target, not a guarantee (what this rests on)

12511 Gorakhpur Jn - Thiruvananthapuram North Raptisagar Express leaves Gorakhpur Jn (GKP) at 06:33 and reaches Thiruvananthapuram North (TVCN) at 15:40 on day 3 of the run. The booked run is 3236 km in 57h 07m, with 60 stops including both ends. It is the only train this timetable version books from Gorakhpur Jn (GKP) through to Thiruvananthapuram North (TVCN).

12511 at a glance

12511 in timetable version .
Runs onThu, Fri, Sun
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed56.7 km/h including halts — ours (how)
TypeExpress · Express
ReservationReserved (PRS) train. 12511 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

60 stops from Gorakhpur Jn GKP to Thiruvananthapuram North TVCN, timed by version , km counted from GKP. +1 is the next day, +2 the one after.
StationArrivesDepartsHaltKm
GKP Gorakhpur Jn start 06:33 — 0
KLD Khalilabad 07:09 07:11 2m 34
BST Basti 07:35 07:37 2m 64
MUR Mankapur Jn 08:21 08:23 2m 126
GD Gonda Jn 08:51 08:54 3m 153
BBK Barabanki Jn 10:25 10:27 2m 242
BNZ Badshahnagar 11:00 11:03 3m 266
ASH Aishbagh 11:35 11:45 10m 276
ON Unnao Jn 12:40 12:42 2m 330
CNB Kanpur Central 13:12 13:17 5m 348
PHN Pokhrayan 14:15 14:17 2m 406
ORAI Orai 14:51 14:53 2m 454
VGLJ Virangana Lakshmibai Jhansi Jn 16:45 16:53 8m 567
LAR Lalitpur 17:48 17:50 2m 656
BPL Bhopal Jn 20:55 21:00 5m 857
ET Itarsi Jn 22:40 22:50 10m 949
GDYA Ghoradongri 23:50 23:51 1m 1019
BZU Betul 00:30 +1 00:32 +1 2m 1056
AMLA Amla Jn 00:52 +1 00:54 +1 2m 1078
PAR Pandhurna 01:50 +1 01:52 +1 2m 1142
NGP Nagpur Jn 03:55 +1 04:00 +1 5m 1244
SEGM Sevagram 04:58 +1 05:00 +1 2m 1320
HGT Hinganghat 05:28 +1 05:30 +1 2m 1354
CD Chandrapur 06:33 +1 06:35 +1 2m 1439
BPQ Balharshah 07:35 +1 07:40 +1 5m 1453
SKZR Sirpur Kaghaznagar 08:34 +1 08:35 +1 1m 1523
BPA Belampalli 08:59 +1 09:00 +1 1m 1561
MCI Mancheral 09:15 +1 09:16 +1 1m 1582
RDM Ramgundam 09:25 +1 09:26 +1 1m 1595
WL Warangal 11:18 +1 11:20 +1 2m 1699
KMT Khammam 12:44 +1 12:45 +1 1m 1804
BZA Vijayawada Jn 15:20 +1 15:30 +1 10m 1905
CLX Chirala 16:43 +1 16:45 +1 2m 1994
OGL Ongole 17:28 +1 17:30 +1 2m 2044
NLR Nellore 18:58 +1 19:00 +1 2m 2160
GDR Gudur Jn 19:48 +1 19:50 +1 2m 2198
MAS Puratchi Thalaivar DR. MGR CTL 22:40 +1 23:10 +1 30m 2333
KPD Katpadi Jn 01:05 +2 01:10 +2 5m 2463
JTJ Jolarpettai Jn 02:18 +2 02:20 +2 2m 2547
SA Salem Jn 03:47 +2 03:50 +2 3m 2671
ED Erode Jn 04:50 +2 05:00 +2 10m 2730
TUP Tiruppur 05:43 +2 05:45 +2 2m 2780
CBE Coimbatore Jn 06:42 +2 06:45 +2 3m 2831
PGT Palakkad Jn 07:55 +2 08:00 +2 5m 2887
OTP Ottappalam 08:24 +2 08:25 +2 1m 2918
WKI Wadakancheri 08:52 +2 08:53 +2 1m 2946
TCR Thrisur 09:12 +2 09:15 +2 3m 2963
IJK Irinjalakuda 09:37 +2 09:38 +2 1m 2987
CKI Chalakudi 09:45 +2 09:46 +2 1m 2993
AFK Angamali 10:03 +2 10:04 +2 1m 3008
AWY Aluva 10:16 +2 10:18 +2 2m 3018
ERN Ernakulam Town 10:38 +2 10:40 +2 2m 3035
ERS Ernakulam Jn 10:55 +2 11:00 +2 5m 3037
SRTL Cherthala 11:31 +2 11:32 +2 1m 3070
ALLP Alappuzha 11:52 +2 11:55 +2 3m 3094
AMPA Ambalappuzha 12:06 +2 12:07 +2 1m 3106
HAD Haripad 12:25 +2 12:26 +2 1m 3124
KYJ Kayankulam Jn 12:48 +2 12:50 +2 2m 3137
QLN Kollam Jn 13:30 +2 13:33 +2 3m 3178
TVCN Thiruvananthapuram North 15:40 +2 end — 3236

What 12511’s schedule looks like

Its longest run without a stop is 201 km and 3h 05m from Lalitpur (LAR) to Bhopal Jn (BPL). The next longest is 135 km and 2h 50m from Gudur Jn (GDR) to Puratchi Thalaivar DR. MGR CTL (MAS).

At 22:00 it is between Bhopal Jn (BPL) and Itarsi Jn (ET), and at 06:00 on day 2 of the run it is between Hinganghat (HGT) and Chandrapur (CD).

13 of its 58 intermediate stops are booked for five minutes or more, the longest of them 30 minutes at Puratchi Thalaivar DR. MGR CTL (MAS), 10 minutes at Aishbagh (ASH), 10 minutes at Itarsi Jn (ET), 10 minutes at Vijayawada Jn (BZA), 10 minutes at Erode Jn (ED). The briefest stop is 1 minute at Ghoradongri (GDYA).

The run crosses midnight before Betul (BZU); every later time carries a day marker.

It passes its own halfway mark of 1618 km at Warangal (WL), stop number 30 of 60, and is booked to stand at its stops for 196 minutes in all, 6% of the 57h 07m journey.

Its quickest booked leg is Virangana Lakshmibai Jhansi Jn (VGLJ) to Lalitpur (LAR), 89 km at an average of 97 km/h.

After Gorakhpur Jn it calls first at Khalilabad (KLD), Basti (BST), Mankapur Jn (MUR), Gonda Jn (GD) and Barabanki Jn (BBK).

Its last stops before Thiruvananthapuram North are Alappuzha (ALLP), Ambalappuzha (AMPA), Haripad (HAD), Kayankulam Jn (KYJ) and Kollam Jn (QLN).

Its stops are not evenly spread: 28 of the 58 fall in the first half of the distance and 30 in the second.

The busiest stations on its route are Vijayawada Jn (BZA), where 480 trains call, Kanpur Central (CNB), where 429 trains call, Itarsi Jn (ET), where 417 trains call.

At BZA it is booked in at 15:20 and away again at 15:30, 1905 km into the run.

How these are counted.

Other trains that share 12511’s route

From 12511’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

12511 is booked out of Gorakhpur Jn at 06:33, which puts it under rule RB-16.12.2025-A: its first reservation chart is expected at about 20:00 on the day before the journey. How we work this out.

A target, not a guarantee

It assumes 12511 is charted at Gorakhpur Jn. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 12511 — Gorakhpur Jn to Thiruvananthapuram North, fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 20:00 above comes from a published railway order, worked out, never observed.