Train Chart Vacancy

22670 Patna Jn - Ernakulam Jn Express Time Table

Departs
16:30
Patna Jn PNBE
Arrives
21:40 day 3
Ernakulam Jn ERS
Journey
53h 10m
3046 km · 37 stops
Chart expected
about 06:30
on the day of travel — a target, not a guarantee (what this rests on)

22670 Patna Jn - Ernakulam Jn Express leaves Patna Jn (PNBE) at 16:30 and reaches Ernakulam Jn (ERS) at 21:40 on day 3 of the run. The booked run is 3046 km in 53h 10m, with 37 stops including both ends. It is the slower of the 2 trains booked from Patna Jn (PNBE) to Ernakulam Jn (ERS), at 53h 10m.

22670 at a glance

22670 in timetable version .
Runs onTue
Calendar row for this train to — beyond 2026-09-30, so not a date we stand behind
Timetable version covers to
Average speed57.3 km/h including halts — ours (how)
TypeExpress · Express
ReservationReserved (PRS) train. 22670 is a 1-, 2- or 8-series number: those are reserved. (how we decide)

Time table and route

37 stops from Patna Jn PNBE to Ernakulam Jn ERS, timed by version , km counted from PNBE. +1 is the next day, +2 the one after.
StationArrivesDepartsHaltKm
PNBE Patna Jn start 16:30 — 0
ARA Ara 17:06 17:08 2m 49
BXR Buxar 17:48 17:50 2m 118
DDU PT.Deen Dayal Upadhyaya Jn 20:00 20:05 5m 208
BSB Varanasi 20:55 21:05 10m 226
GYN Gyanpur Road 22:00 22:02 2m 286
PRYJ Prayagraj Jn 00:10 +1 00:35 +1 25m 350
STA Satna 03:20 +1 03:25 +1 5m 528
KTE Katni 04:35 +1 04:40 +1 5m 626
JBP Jabalpur 06:10 +1 06:20 +1 10m 717
ET Itarsi Jn 10:15 +1 10:25 +1 10m 962
GDYA Ghoradongri 11:30 +1 11:31 +1 1m 1032
BZU Betul 12:09 +1 12:11 +1 2m 1069
NGP Nagpur Jn 15:05 +1 15:10 +1 5m 1257
CD Chandrapur 17:43 +1 17:45 +1 2m 1452
BPQ Balharshah 18:50 +1 18:55 +1 5m 1466
BPA Belampalli 20:04 +1 20:05 +1 1m 1575
MCI Mancheral 20:19 +1 20:20 +1 1m 1595
RDM Ramgundam 20:39 +1 20:40 +1 1m 1609
WL Warangal 21:48 +1 21:50 +1 2m 1712
KMT Khammam 23:18 +1 23:20 +1 2m 1818
BZA Vijayawada Jn 01:50 +2 02:00 +2 10m 1919
TEL Tenali Jn 02:34 +2 02:35 +2 1m 1950
OGL Ongole 04:09 +2 04:10 +2 1m 2057
NLR Nellore 05:39 +2 05:40 +2 1m 2173
GDR Gudur Jn 06:28 +2 06:30 +2 2m 2211
PER Perambur 09:05 +2 09:10 +2 5m 2348
KPD Katpadi Jn 10:50 +2 11:05 +2 15m 2472
JTJ Jolarpettai Jn 12:33 +2 12:35 +2 2m 2556
SA Salem Jn 13:57 +2 14:00 +2 3m 2680
ED Erode Jn 15:00 +2 15:10 +2 10m 2739
TUP Tiruppur 15:53 +2 15:55 +2 2m 2789
CBE Coimbatore Jn 16:57 +2 17:00 +2 3m 2839
PGT Palakkad Jn 18:25 +2 18:30 +2 5m 2896
TCR Thrisur 19:42 +2 19:45 +2 3m 2972
AWY Aluva 20:38 +2 20:40 +2 2m 3026
ERS Ernakulam Jn 21:40 +2 end — 3046

What 22670’s schedule looks like

Of the 2 trains booked from Patna Jn (PNBE) to Ernakulam Jn (ERS), the other is 22644 Patna Jn - Ernakulam Jn Express at 49h 20m.

Its longest run without a stop is 245 km and 3h 55m from Jabalpur (JBP) to Itarsi Jn (ET). The next longest is 195 km and 2h 33m from Nagpur Jn (NGP) to Chandrapur (CD).

At 22:00 it is standing at Gyanpur Road (GYN), and at 06:00 on day 2 of the run it is between Katni (KTE) and Jabalpur (JBP).

14 of its 35 intermediate stops are booked for five minutes or more, the longest of them 25 minutes at Prayagraj Jn (PRYJ), 15 minutes at Katpadi Jn (KPD), 10 minutes at Varanasi (BSB), 10 minutes at Jabalpur (JBP), 10 minutes at Itarsi Jn (ET). The briefest stop is 1 minute at Ghoradongri (GDYA).

The run crosses midnight before Prayagraj Jn (PRYJ); every later time carries a day marker.

It passes its own halfway mark of 1523 km at Belampalli (BPA), stop number 17 of 37, and is booked to stand at its stops for 163 minutes in all, 5% of the 53h 10m journey.

Its quickest booked leg is Ara (ARA) to Buxar (BXR), 69 km at an average of 104 km/h.

After Patna Jn it calls first at Ara (ARA), Buxar (BXR), PT.Deen Dayal Upadhyaya Jn (DDU), Varanasi (BSB) and Gyanpur Road (GYN).

Its last stops before Ernakulam Jn are Tiruppur (TUP), Coimbatore Jn (CBE), Palakkad Jn (PGT), Thrisur (TCR) and Aluva (AWY).

Its stops are not evenly spread: 15 of the 35 fall in the first half of the distance and 20 in the second.

The busiest stations on its route are Vijayawada Jn (BZA), where 480 trains call, Itarsi Jn (ET), where 417 trains call, PT.Deen Dayal Upadhyaya Jn (DDU), where 400 trains call.

At BZA it is booked in at 01:50 and away again at 02:00, 1919 km into the run.

How these are counted.

Other trains that share 22670’s route

From 22670’s halt rows, not its name. Trains without a page here are left out.

Reservation chart and seat availability

22670 is booked out of Patna Jn at 16:30, which puts it under rule RB-16.12.2025-B: its first reservation chart is expected at about 06:30 on the day of the journey. How we work this out.

A target, not a guarantee

It assumes 22670 is charted at Patna Jn. The rule is press-reported: no circular number has been located, and the first report covered one zone. Preparation can be later. The circulars, the second chart and what is still unsettled.

Check live seat availability for 22670 — Patna Jn to Ernakulam Jn, fetched when you ask and never stored here (how).

Where this came from

Every time and distance above is read from timetable version , and from nothing else. Where the timetable data comes from.

The 06:30 above comes from a published railway order, worked out, never observed.